Method
How Matt tests
- 01 Writes the protocol for a category before the first unit arrives: loads, holds, rep counts, stop rules.
- 02 Stands at the press frame for every static test above 150 kg.
- 03 Pulls a unit that fails a safety limit off the floor the same day. The test is not re-run to get a better number.
- 04 Reviews every platform session log before a score is proposed.
The full methodology →
Signed pieces
1 on the site -
Roundup · Plates
Byline · Updated